Skip to content
← Все статьи

Mooring English: Commands and Terms for the Deck Crew

· 3 мин чтения

Read in other languages: RU | UA | EN

Mooring is one of the tensest moments of a voyage: orders come fast, there’s no time to think it over, and a misunderstood word can cost a parted line or an injury on deck. Let’s go through the English a deck crew needs to know on the forecastle, the poop deck, and at the windlass.

Why it’s a critical topic

Unlike watchkeeping on the bridge, where orders come over a loudhailer, on the forecastle and poop deck a sailor often hears the order over a handheld radio against wind, running machinery, and spray. What matters here isn’t just getting the term right, but reacting instantly to a short order with no time to ask for clarification.

Key mooring commands

  • Stand by fore / aft — get ready on the forecastle / poop deck
  • Send the line ashore — pass a line to the shore
  • Slack away — pay out the line
  • Heave in / haul in — take in the line
  • Hold on / hold the line — hold the line, neither paying out nor taking in
  • Make fast — secure (make fast on the bollards/bitts)
  • Let go — release (e.g. let go a mooring line or the anchor)

Mooring equipment terms

  • Bollard — a mooring post on deck or ashore
  • Bitts — a pair of mooring posts on deck
  • Fairlead — a guide that leads a line through the ship’s side
  • Mooring winch — the winch used to heave in mooring lines
  • Heaving line — a light line thrown ashore first, with a weighted end
  • Fender — a cushion between the hull and the quay

Anchoring

  • Let go the anchor — release the anchor
  • Walk back the anchor — lower the anchor under power on the windlass, under control, rather than letting it run free
  • How much cable is out? — how many shackles of chain have been paid out?
  • The anchor is holding / dragging — the anchor is holding / not holding, dragging
  • Brought up — the ship has come to anchor and stopped

Reports during the operation

A sailor on the forecastle or poop deck must report clearly and briefly to the bridge on the state of the line or chain:

  • “Line is fast forward” — the forward line is secured
  • “Anchor is aweigh” — the anchor has broken free of the bottom
  • “All lines are fast” — all lines are secured, the ship is moored

How to train this English

  • Practise the commands in pairs: one gives the order, the other echoes it back, the same way it’s done on the bridge.
  • Learn the equipment terms from photos of the deck — a visual link sticks faster than a word list.
  • Rehearse the reports in their short form — nobody speaks in full sentences during a real mooring operation.
  • At interviews, be ready to explain the difference between slack away and let go — they’re often confused, and mixing up the command on a mooring job has serious consequences.

Conclusion

Mooring doesn’t forgive a slow reaction or an approximate understanding of the commands. At Sea Service we drill these commands until they’re automatic — the same way watch reports and radio communication are drilled — so that on a real deck there’s not a split second of doubt.

Связаться в WhatsApp